General Organization for Textile Industry.
Al Furat Spinning Co. Syria. Deir Ezzor.
No: 1093/S.J.
Date:12 / 6/2006
Call for offer prices Internal/ External – Translated
/ In normal speed for the first time/
El Furat Spinning Co. announces its need to Call for offer prices for Supplying , erection and operation of yarn faults classifying instrument for tender NO according to special book conditions related to this announcement
1-Bid bond /3000/ EURO paid duly .
2-Performance bond 10% of the contract value paid in a form of accepted bank guarantee from one of the banks in Syria.
3-Offerer should stick to his offer /180/ days from the date of deadline.
4-Execution period shortest possible and it will be taken into consideration at financial evaluation.
5-The announcement is according to contracts system No.51 for 2004.
6-Offers are strictly accepted from the manufactured companies or from its commercial agents registered duly by Ministry of Economy and Commerce or the distributed companies adopted by the manufactured companies for equipment , machinery and spare parts.
7-The file is free of charge.
8-The prices offered are considered final and not accepting breaking or decreasing after the closing date.
9-The file can be obtained either by hand or correspondence from the commercial Directorate in the company.
10-Offers are submitted to the company's registration office – Syria - Deir Ezzor Al- Hassakeh Road 7 Km P.O.Box /6/ Tel: 214762- 214763-223060- Fax: 221528.
- Deadline for accepting offers15 / 8 / 2006
G.M
Eng. SHOGAA ARIB
ANNEX NO.1 Technical Specifications
A. Machinery
Equipments for 2 sets of Combination Air Conditioning
( Blast air capacity 205000m³/h )
|
NO |
NAME |
QTY (SET) |
|
|
1 |
ZKW-200 Combination Air Conditioner ( Including splash unit, middle unit and blast unit) |
2 |
|
|
2 |
FZ40-11 Axial Blast Fan ( 55kw. With frequency converter) |
2 |
|
|
3 |
Water pump 22kw. |
2 |
|
|
4 |
Water pump 0.18 kw |
2 |
|
|
5 |
FZ40-11 –Axial Return –Air Fan (frequency conversion 45kw) |
2 |
|
|
6 |
JYF-2-30 Returned –Air Filter |
4 |
|
|
7 |
Sealing & inspection door |
XQ 800B X1800H |
6 |
|
XQ 600B X 1200H |
4 |
||
|
8 |
JYRB Light Pipe Heater |
2 |
|
|
9 |
XQ Fixed Window Shade ( for fresh air ) 15m² |
2 |
|
|
10 |
XQ Air Capacity Adjusting window ( for fresh air) 15m² |
2 |
|
|
11 |
XQ Air Capacity Adjusting window ( for return air) 13m² |
2 |
|
|
12 |
XQ Air Capacity Adjusting window ( for exhaust air) 13m² |
2 |
|
|
13 |
Central Controller |
2 |
|
B. Technical conditions:
1. CTEXIC Company will send specialist to visit the site ,provide design and
equipment list and choose suitable erection place for the equipment
after we win the tender.
2. CTEXIC Company will provide the following drawings : equipment layout, civil
constructions , mechanical and electrical drawings etc. After signing
the contract.
3. Air conditioning unit provides with capacity of 205000m³/h the required humidity
for all kinds of cotton yarns according to international standards .
4. We will provide complete technical specifications for all the required
mechanical and electrical equipment after signing the contract.
5. We will provide operation description for each part after singing the
contract.
6. CTEXIC Company provides the required tools for erection.
|
NO |
NAME |
QTY (piece) |
|
1 |
Hammer |
1 |
|
2 |
Steel Tape |
2 |
|
3 |
Aiguille |
1 |
|
4 |
Plate File |
2 |
|
5 |
Sleeve Spanner |
2 |
|
6 |
Angle Ruler |
2 |
|
7 |
Multimeter |
1 |
|
8 |
Drill |
1 |
|
9 |
Minus/Cross Screw-driver |
3 for each |
|
10 |
Terminal Board |
1 |
|
11 |
Hack Saw |
1 |
7. The Combination Air Conditioning Unit work according to Automatic Control
System.
8. We will provide required catalogues and technical leaflets for maintenance
and operation after signing the contract.
9. We will insure all cables and wire well insulated , wrapped , fixed and distributed
in good way when being installed.
10. Electric current ( 380 V ± 10 ) 50Hz , with protection of sudden low current and
the motor protection ( IP-44 ) dust and water proof.
Two motors for the system.
1- Axial Blast Fan FZ40-11 INSTALL POWER 55kw.
2- Axial Return –Air Flow Fan FZ40-11 ,install power 45Kw.
11. The level of noise is ≤ 80db, within the allowed level internationally.
12. The number of equipment is 2 sets of Combination Air Conditioning Unit.
13. The design chooses water filter to purify and filtrate water from impurities, lime
and precipitates to insure the equipment's safety.
14. It's suitable for three shifts.
15- The necessary civil works will born by the Chinese side.
16. The conditioning unit must achieve the required aim of it for the required
humidity , temperature and the purity of the workshop for the work of twisting
machines in the workshop.
ANNEX NO. /2/ Financial Offer
|
No |
Name |
Qty. |
Unit price ( USD) |
Sub-total (USD) |
|
1 |
Combination Air Conditioning Unit 205000m³/h |
2 sets |
47526.30 |
95052.59 |
|
2 |
Air condition Auto-control system |
2 sets |
10863.11 |
21726.22 |
|
3 |
Duct |
23222 kg |
1.86 |
43095.39 |
|
4 |
Connector for duct 25x100cm |
240 pieces |
20.34 |
4881.50 |
|
5 |
Air inlet 43x95 cm |
61 pieces |
20.34 |
1240.71 |
|
6 |
Air inlet 38x93 cm |
70 pieces |
20.34 |
1423.77 |
|
7 |
Air inlet 68x93 cm |
18 pieces |
20.34 |
366.11 |
|
8 |
Air inlet 43x72cm |
4 pieces |
20.34 |
81.36 |
|
9 |
Two-years spare parts |
1 set |
5431.56 |
|
|
Total Amount (USD) |
173,299.21 |
|||
Note:
1. The above quotation is on basis of:
USD 173,299.21 FOB Chinese port.
USD 191,299.21 C&F Syrian port.
2. The weight of goods are about:
Gross weight : 61100 kg.
Net weight : 45720 kg.
3. The volume of goods is about : 321m³, 35 cases in total. For details , please
Refer to B part 11th item of the technical part.
4. Package : Wooden cases suitable for seaworthy transport.
5. Port of loading : Shanghai port, China.
6. Goods' country of origin is China.
7. The above quotation does not include the civil works.
8. The above quotation includes the expenses of design, installation & debugging
Investigation on site , training and one-year quality guarantee.
9. Shipment time : 60 days after being notified receiving your L/C.
Erection and start operation time : 60 days.
ANNEX No. 3 Spare parts list ( for two years )
|
No |
Name |
Qty |
|
1 |
Combination Air Conditioning Unit |
|
|
|
Texrope Belt for 4-79 fan 55kw |
2 sets |
|
Texrope for 4-79 fan 45kw |
2.5 sets |
|
|
Bearing for 4-79 fan |
4 sets |
|
|
Bearing for 4-79 fan |
5 sets |
|
|
Bearing for 4-79 fan 55kw |
4 sets |
|
|
Bearing for 4-79 fan 45kw |
5 sets |
|
|
FL-4 Spray Nozzle |
100 pieces |
|
|
JYS-2-15 Ball Bearing |
50 pieces |
|
|
Nmrv063 Motor Decelerator |
1 set |
|
|
2 |
Air Capacity Adjusting Window |
|
|
|
JYCL- 02 ABS Bush |
40 pieces |
|
|
JYCL- 03 ABS Axle journal head |
4 pieces |
|
|
JYCL- 04 ABS Taper Pin |
5 pieces |
|
JYCL- 09 ABS Connecting Axle |
2 pieces |
|
|
JYCL- 17 ABS Rocker Arm Axle |
2 pieces |
|
|
3 |
For Air Capacity Changeable Return –Air Filter |
|
|
|
V model A2500 Texrope |
2 pieces |
|
JYFB-2a-03 Link Lever |
5 pieces |
|
|
1000832 Bearing |
2 pieces |
|
|
Stainless Steel Wire Web |
9m² |
ANNEX NO. 4 Erection & Training
Training
- Internal training: To train /4/ four technicians during the erection time.
- External training: To train /4/ four technicians in China for /14/ days after the execution of contract at the own expenses of the Chinese Side including two way flight tickets to China, stay, food , transport , pocket money and medical care if necessary .
Execution ( Erection & Start operation )
- Shipment : /60/ days after receiving the details of the confirmed L/C.
- Erection : /60/ days for erection and start operation